All Sites Norwegian search
search language button
Equinor logo
  • What we do
    • What we do
    • Autumn conference 2020
    • Exploration
    • Fields and platforms
    • Terminals and refineries
    • Crude oil assays
    • Natural gas
    • REMIT
    • Shipping
    • Renewables
    • Offshore wind
    • Solar energy
    • Low carbon solutions
    • Hydrogen
    • H2H Saltend
    • Equinor Ventures
  • Where we are
    • Where we are
    • Algeria
    • Angola
    • Argentina
    • Australia
    • Azerbaijan
    • Bahamas
    • Belgium
    • Brazil
    • Canada
    • China
    • Denmark
    • EU — European Union
    • Germany
    • India
    • Ireland
    • Japan
    • Libya
    • Mexico
    • The Netherlands
    • Nicaragua
    • Nigeria
    • Norway
    • Poland
    • Russia
    • Singapore
    • South Africa
    • South Korea
    • Suriname
    • Tanzania
    • United Arab Emirates
    • United Kingdom
    • United States
    • Venezuela
  • How & why
    • How & why
    • Sustainability
    • Climate
    • ESG Reporting centre
    • Health, safety and security
    • Energy Perspectives
    • Impact assessments
    • Human rights
    • Digitalisation
  • Careers
    • Careers
    • Experienced professionals
    • Students
    • Graduates
    • Apprentices
    • Summer interns
    • What we offer
    • Culture & values
    • Recruitment scams
  • Stories
    • Stories
    • Women leaders in Equinor
    • Reflections from our CEO
    • Dogger Bank offshore wind
    • safeguarding our wellbeing
    • Responding to criticism of hydraulic fracturing in the US
    • Hydrogen and Carbon capture
    • Weldar welding robot
    • Breakthrough for digitalisation
    • Hywind Tampen offshore wind farm
    • Greening our shipping
    • Why wind is the future
    • Echo — Equinor’s digital twin
    • IT experts in the Pyrenees
    • Statfjord A 40 years
    • Thorolf Rafto Challenge
    • Why is Johan Sverdrup important?
    • Can artificial intelligence save lives?
    • Is gas good for the environment?
    • Most digital workplace
    • Ocean of opportunities
    • Coding the energy future
    • Carbon capture solutions
    • Digitalisation changing lives
    • Techstars accelerator
    • Cutting CO2 emissions
    • Britain’s declining emissions
    • Lifting a platform
    • Cardiac arrest offshore
    • Battery hybrid supply ship
    • Pioneering Aasta Hansteen
    • Halvor in charge of Hywind
    • Offshore wind radar
    • Drilling with apps
    • Exciting inventions
    • How we cut costs
    • How Hywind was born
    • Building Hywind
    • Broad energy major
    • Living in a fridge
    • Gina Krog points the way
    • CEO Eldar Sætre speaks about the name change
    • Hooking up Mariner
    • Equinor’s new energy apprentices
    • Sætre at CERA week
    • Electrification of platforms
    • Competence transfer
    • Fieldmade 3D printed spare parts
  • About us
    • About us
    • Corporate governance
    • Organisation
    • Corporate Executive Committee
    • Governing bodies
    • Board of Directors
    • Annual General Meeting
    • Ethics and compliance in Equinor
    • Site info
    • Contacting Equinor
    • Heroes of Tomorrow
    • About our name change
    • Dialog: klima og energi
    • Glossary
  • News & media
  • Investors
    • Investors
    • Equity story
    • The Equinor share
    • Our shareholders
    • Annual Reports
    • Our quarterly results
    • Consensus
    • Contacts for investors
  • Suppliers
  • All Sites

Tune

Photo of a group of people at the Oseberg platform

Tune lies 10 kilometres southwest of the Oseberg Field Center and is developed with subsea production installations tied into the Field Center.

The Tune field was discovered with an exploration well in 1995 and confirmed with an appraisal well in 1996.

Tune started producing just six years after its confirmation.

It has been developed with a sea-floor template with four wells tied into the Oseberg Field Center, and with hook-up possibilities for two additional satellite wells. 

The gas volumes from Tune will be used for injection purposes to boost oil production pressure on Oseberg. The injected gas will later be recovered along with Oseberg gas and exported.

This contributes to more efficient recovery of resources from the Oseberg field.

Total development costs on the Tune project are NOK 3.2 billion (USD 453 million/EUR 413 million), including drilling of production wells.

platform illustration

Location: 10 kilometres southwest of the Oseberg Field Center
Production start: 22 November 2002
Production: Gas

Norwegian petroleum

  • Facebook
  • Twitter
  • Instagram
  • YouTube
  • LinkedIn
  • Terms and conditions
  • Privacy policy
  • Site info
  • Contact us
  • RSS
  • Cookie policy
Copyright © 2021 Equinor ASA