The Vale field will – according to plan – produce 1.6 million Sm3 gas and 2,600 barrels condensate per day via Heimdal. Water depths in the area are approximately 115 metres.
Location: A sea-floor template tied into the Heimdal Gas Center platform
Production start: 31 May 2002
Production: Gas and condensate