Designated Veslefrikk B, this semi-submersible structure is tied to a fixed steel wellhead platform – Veslefrikk A.
Oil from the field is landed via the pipeline from the Oseberg development to the Sture terminal outside Bergen. Gas travels through the Statpipe system via Kårstø north of Stavanger to Emden in Germany.
Location: Block 30/3 in the North Sea.
Production start: 26 December 1989
Production: Oil and gas