All Sites Norwegian search
search language button
Equinor logo
  • What we do
    • What we do
    • Autumn conference 2020
    • Exploration
    • Fields and platforms
    • Terminals and refineries
    • Crude oil assays
    • Natural gas
    • REMIT
    • Shipping
    • Renewables
    • Offshore wind
    • Solar energy
    • Low carbon solutions
    • Hydrogen
    • H2H Saltend
    • Equinor Ventures
  • Where we are
    • Where we are
    • Algeria
    • Angola
    • Argentina
    • Australia
    • Azerbaijan
    • Bahamas
    • Belgium
    • Brazil
    • Canada
    • China
    • Denmark
    • EU — European Union
    • Germany
    • India
    • Ireland
    • Japan
    • Libya
    • Mexico
    • The Netherlands
    • Nicaragua
    • Nigeria
    • Norway
    • Poland
    • Russia
    • Singapore
    • South Africa
    • South Korea
    • Suriname
    • Tanzania
    • United Arab Emirates
    • United Kingdom
    • United States
    • Venezuela
  • How & why
    • How & why
    • Sustainability
    • Climate
    • ESG Reporting centre
    • Health, safety and security
    • Energy Perspectives
    • Impact assessments
    • Human rights
    • Digitalisation
  • Careers
    • Careers
    • Experienced professionals
    • Students
    • Graduates
    • Apprentices
    • Summer interns
    • What we offer
    • Culture & values
    • Recruitment scams
  • Stories
    • Stories
    • Dogger Bank offshore wind
    • safeguarding our wellbeing
    • Responding to criticism of hydraulic fracturing in the US
    • Hydrogen and Carbon capture
    • Weldar welding robot
    • Breakthrough for digitalisation
    • Hywind Tampen offshore wind farm
    • Greening our shipping
    • Why wind is the future
    • Echo — Equinor’s digital twin
    • IT experts in the Pyrenees
    • Statfjord A 40 years
    • Thorolf Rafto Challenge
    • Why is Johan Sverdrup important?
    • Can artificial intelligence save lives?
    • Is gas good for the environment?
    • Most digital workplace
    • Ocean of opportunities
    • Coding the energy future
    • Carbon capture solutions
    • Digitalisation changing lives
    • Techstars accelerator
    • Cutting CO2 emissions
    • Britain’s declining emissions
    • Lifting a platform
    • Cardiac arrest offshore
    • Battery hybrid supply ship
    • Pioneering Aasta Hansteen
    • Halvor in charge of Hywind
    • Offshore wind radar
    • Drilling with apps
    • Exciting inventions
    • How we cut costs
    • How Hywind was born
    • Building Hywind
    • Broad energy major
    • Living in a fridge
    • Gina Krog points the way
    • CEO Eldar Sætre speaks about the name change
    • Hooking up Mariner
    • Equinor’s new energy apprentices
    • Sætre at CERA week
    • Electrification of platforms
    • Competence transfer
    • Fieldmade 3D printed spare parts
  • About us
    • About us
    • Corporate governance
    • Organisation
    • Corporate Executive Committee
    • Governing bodies
    • Board of Directors
    • Annual General Meeting
    • Ethics and compliance in Equinor
    • Site info
    • Contacting Equinor
    • Heroes of Tomorrow
    • About our name change
    • Dialog: klima og energi
    • Glossary
  • News & media
  • Investors
    • Investors
    • Equity story
    • The Equinor share
    • Our shareholders
    • Annual Reports
    • Our quarterly results
    • Consensus
    • Contacts for investors
  • Suppliers
  • All Sites

Vigdis

Picture of Vigdis subsea installation

Vigdis lies in block 34/7 in the Tampen area of the Norwegian North Sea and came on stream in 1997. In addition to the main structure, this field comprises the Borg Nordvest and Vigdis Øst structures. These began producing in 2003 and 2004 respectively. Water depth is approx 280 meters.

Vigdis has been developed with subsea installations tied back to the Snorre A platform seven kilometres away for processing. Gas separated from the main Vigdis structure is injected into the Snorre field, while gas from Borg Nordvest and Vigdis Øst is piped from Snorre A to Statfjord A.

Stabilised oil is transported by pipeline to Gullfaks A for storage and export.

The former Saga Petroleum company became operator for licence PL 089 when the licence was awarded in 1984. Norsk Hydro took over operatorship after acquiring Saga in 1999.

Then Statoil, now Equinor, took over operatorship on 1 January 2003.

platform illustration

Location: Block 34/7 in the Tampen area of the Norwegian North Sea.
Production start: 28 January 1997 
Production: Oil 

Norwegian petroleum

  • Facebook
  • Twitter
  • Instagram
  • YouTube
  • LinkedIn
  • Terms and conditions
  • Privacy policy
  • Site info
  • Contact us
  • RSS
  • Cookie policy
Copyright © 2021 Equinor ASA