The Draupner S platform was installed in 1984. Draupner E was installed in 1994. The platforms stand in 70 metres of water in block 16/11. The platforms stand close together and are linked by a bridge.
The Draupner installations play a key role in Norway's gas transport system to continental Europe.
Operator: Gassco
Technical service provider: Equinor
Location: Block 16/11
Hub for the following pipelines: Statpipe, Zeepipe I, Zeepipe IIB, Europipe I, Franpipe
Transport capacity: 130 million cubic metres per day