REMIT operational data

Photo: Ole Jørgen Bratland

Natural gas

In accordance with EU Regulation No. 1227/2011 (REMIT) Equinor inside information related to gas including planned and unplanned unavailability of production or transportation of natural gas is published by using Gassco AS as Inside Information Platform (IIP) on the following website: https://umm.gassco.no

Should Equinor become aware of relevant information which is not published by Gassco AS, Equinor will immediately inform Gassco as well as publish this information here. The indicated volume impact published on this page only concerns volumes marketed by Equinor; the indicated volume impact is the daily volume for outages of 24 hours or longer, or the end of day impact in case of an outage for less than 24 hours.

Publication of operational information is made in good faith to the best of our knowledge at the time of publication, but no warranty is given as to its accuracy or completeness. When an update about an event becomes available, the entry in the table will be updated accordingly.

Natural gas storage

All REMIT relevant information with regards to the Etzel Gas-Lager storage facility operated by Equinor Deutschland Storage GmbH is published on the following websites: www.equinorstorage.de  and https://agsi.gie.eu/  with specific availability or unavailability listed here: www.equinorstorage.de  under Wartung und Instandhaltung (Maintenance Information) and https://agsi.gie.eu/#/unavailability .

For the Aldbrough Gas Storage facility  located in the UK: https://remit.gb.net

For the Corrib Gas field located in Ireland: https://iip.remitor.eu/#/

Electricity

All REMIT relevant information with regard to electricity production or consumption facilities owned and/or operated by Equinor is published on the following websites:

For facilities located in the Nordic region: www.nordpoolgroup.com .

For facilities located in the UK: www.bmreports.com

REMIT table - historic information (XLSX)

Regulatory information