Skip to main content

News

The Aasta Hansteen platform in the Norwegian Sea
|

Equinor aims to continue growing after 50 years in Northern Norway

Equinor is marking 50 years of operations in Northern Norway. After five decades of investment and value creation, the company is planning for high activity and growth in the region for many decades to come.

|

Equinor first quarter 2026 results

Shuttle tanker Eagle Balder in position off the Gullfaks field.
|

Equinor’s annual report for 2025

|

New oil discovery strengthens the development of Johan Castberg

A small part of the Johan Castberg FPSO with the sun shining in the background
|

Equinor fourth quarter and full year 2025 results

Troll A platform from a distance.
|

Billion-NOK contract for helicopter transportation and emergency preparedness in the Barents Sea

Two parked S-92 helicopters with the moon in the evening sky
|

Major contract awards to Norwegian supplier industry

Employee walking down a staircase on Johan Castberg FPSO in the Barents Sea.
|

Investing in the next phase at Johan Castberg

Johan Castberg production ship august 2024
|

Equinor third quarter 2025 results

FPSO Bacalhau at the field.
|

Johan Castberg officially opened

Energy Minister Terje Aasland and electrician Iver Henninen marks the official opening of Johan Castberg.
|

Equinor second quarter 2025 results

Johan Castberg FPSO.
|

Oil discovery in the Johan Castberg area in the Barents Sea

The Transocean Enabler drilling rig
|

Johan Castberg producing at full capacity

The first cargo from Johan Castberg was loaded by the tanker Bodil Knutsen on 25 May
|

Equinor first quarter 2025 results

The Johan Castberg FPSO on the field
|

Ripple effects from Equinor in Norway continue to grow

Oseberg field centre in the North Sea
|

Johan Castberg strengthens Norway as a long-term energy exporter

The Johan Castberg FPSO on the field
|

Equinor presents 2024 Annual report

|

Approaching start-up for Johan Castberg

The Johan Castberg FPSO on the field
|

Equinor third quarter 2024 results

Johan Sverdrup field center
|

Equinor reports on Norwegian development projects

The floating production, storage and offloading vessel (FPSO) Johan Castberg