All Sites Norwegian search
search language button
Equinor logo
  • What we do
    • What we do
    • Autumn conference 2020
    • Exploration
    • Fields and platforms
    • Terminals and refineries
    • Crude oil assays
    • Natural gas
    • REMIT
    • Shipping
    • Renewables
    • Offshore wind
    • Solar energy
    • Low carbon solutions
    • Hydrogen
    • H2H Saltend
    • Equinor Ventures
  • Where we are
    • Where we are
    • Algeria
    • Angola
    • Argentina
    • Australia
    • Azerbaijan
    • Bahamas
    • Belgium
    • Brazil
    • Canada
    • China
    • Denmark
    • EU — European Union
    • Germany
    • India
    • Indonesia
    • Ireland
    • Japan
    • Libya
    • Mexico
    • The Netherlands
    • Nicaragua
    • Nigeria
    • Norway
    • Poland
    • Russia
    • Singapore
    • South Africa
    • South Korea
    • Suriname
    • Tanzania
    • United Arab Emirates
    • United Kingdom
    • United States
    • Venezuela
  • How & why
    • How & why
    • Sustainability
    • Climate
    • Reporting centre
    • Health, safety and security
    • Energy Perspectives
    • Impact assessments
    • Human rights
    • Digitalisation
  • Careers
    • Careers
    • Experienced professionals
    • Students
    • Graduates
    • Apprentices
    • Summer interns
    • What we offer
    • Culture & values
    • Recruitment scams
  • Stories
    • Stories
    • safeguarding our wellbeing
    • Responding to criticism of hydraulic fracturing in the US
    • Hydrogen and Carbon capture
    • Weldar welding robot
    • Breakthrough for digitalisation
    • Hywind Tampen offshore wind farm
    • Greening our shipping
    • Why wind is the future
    • Echo — Equinor’s digital twin
    • IT experts in the Pyrenees
    • Statfjord A 40 years
    • Thorolf Rafto Challenge
    • Why is Johan Sverdrup important?
    • Can artificial intelligence save lives?
    • Is gas good for the environment?
    • Most digital workplace
    • Ocean of opportunities
    • Coding the energy future
    • Carbon capture solutions
    • Digitalisation changing lives
    • Techstars accelerator
    • Cutting CO2 emissions
    • Britain’s declining emissions
    • Lifting a platform
    • Kristin finding entrepreneurs
    • Cardiac arrest offshore
    • Battery hybrid supply ship
    • Pioneering Aasta Hansteen
    • Halvor in charge of Hywind
    • Offshore wind radar
    • Drilling with apps
    • Exciting inventions
    • How we cut costs
    • How Hywind was born
    • Building Hywind
    • Broad energy major
    • Living in a fridge
    • Gina Krog points the way
    • CEO Eldar Sætre speaks about the name change
    • Hooking up Mariner
    • Equinor’s new energy apprentices
    • Sætre at CERA week
    • Electrification of platforms
    • Competence transfer
  • About us
    • About us
    • Corporate governance
    • Organisation
    • Corporate Executive Committee
    • Governing bodies
    • Board of Directors
    • Annual General Meeting
    • Ethics and compliance in Equinor
    • Site info
    • Contacting Equinor
    • Heroes of Tomorrow
    • About our name change
    • Dialog: klima og energi
    • Glossary
  • News & media
  • Investors
    • Investors
    • Equity story
    • The Equinor share
    • Our shareholders
    • Annual Reports
    • Our quarterly results
    • Consensus
    • Contacts for investors
  • Suppliers
  • All Sites

We use cookies to provide the best possible experience for you. By closing this message you agree to our use of cookies. You can learn more about cookies on our privacy and settings page.

Turnarounds

This page is available in English only

Production impact of turnarounds 2019
Due to maintenance, our installations will be partly or fully closed down for shorter periods of time. This will affect the production of oil and natural gas. 

On this page, we give an estimate of reduced production due to maintenance for the coming quarter. We will also give an estimate of the total annual effect of reduced production due to maintenance.

Turnaround 2020
For 2020 the turnaround volumes are for liquids and gas.

2020  
Second quarter 2020 Approximately 10.000 boepd (in quarterly effect)
First quarter 2020 Approximately 20.000 boepd (in quarterly effect)
Annual effect 2020 Approximately 30.000 boepd

Turnaround 2019
For 2019 the turnaround volumes are for liquids and gas.

2019  
Fourth quarter 2019 Approximately 30.000 boepd (in quarterly effect)
Third  quarter 2019 Approximately 50.000 boepd (in quarterly effect)
Second quarter 2019 Approximately 60.000 boepd (in quarterly effect)
First quarter 2019 Approximately 15.000 boepd (in quarterly effect)
Annual effect 2019 Approximately 40.000 boepd

Turnaround 2018
For 2018 the turnaround volumes are for liquids and gas.

2018  
Fourth quarter 2018 Approximately 10.000 boepd (in quarterly effect)
Third quarter 2018 Approximately 80.000 boepd (in quarterly effect)
Second quarter 2018 Approximately 50.000 boepd (in quarterly effect)
First quarter 2018 Approximately 10.000 boepd (in quarterly effect)
Annual effect 2018 Approximately 35.000 boepd

Turnaround 2017
For 2017 the turnaround volumes are for liquids and gas.

2017  
Fourth quarter 2017 Approximately 25.000 boepd (in quarterly effect)
Third quarter 2017 Approximately 50.000 boepd (in quarterly effect)
Second quarter 2017 Approximately 75.000 boepd (in quarterly effect)
First quarter 2017 Approximately 10.000 boepd (in quarterly effect)
Annual effect 2017 Approximately 30.000 boepd

Turnaround 2016
For 2016 the turnaround volumes are for liquids and gas.

2016  
Fourth quarter 2016 Approximately 40.000 boepd (in quarterly effect)
Third quarter 2016 Approximately 55.000 boepd (in  quarterly effect)
Second quarter 2016 Approximately 25.000 boepd (in quarterly effect)
First quarter 2016 Approximately 25.000 boepd (in quarterly effect)
Annual effect 2016 Approximately 60.000 boepd

Turnaround 2015
For 2015 the turnaround volumes are for liquids and gas.

2015  
Fourth quarter 2015     Approximately 15.000 boepd
Third quarter 2015 Approximately 45.000 boepd (in quarterly effect)
Second quarter 2015 Approximately 95.000 boepd (in quarterly effect)
First quarter 2015 Approximately 10.000 boepd (in quarterly effect)
Annual effect 2015 Approximately 40.000 boepd

Turnaround 2014
For 2014 the turnaround volumes are for liquids and gas.

2014  
Third quarter 2014 Approximately 60.000 boepd (in quarterly effect)
Second quarter 2014 Approximately 110.000 boepd (in quarterly effect)
First quarter 2014 Approximately 10.000 boepd (in quarterly effect)
Annual effect 2014 Approximately 50.000 boepd
  • Facebook
  • Twitter
  • Instagram
  • YouTube
  • LinkedIn
  • Terms and conditions
  • Privacy policy
  • Site info
  • Contact us
  • RSS
Copyright © 2021 Equinor ASA