All Sites Norwegian search
search language button
Equinor logo
  • What we do
    • What we do
    • Autumn conference 2020
    • Exploration
    • Fields and platforms
    • Terminals and refineries
    • Crude oil assays
    • Natural gas
    • REMIT
    • Shipping
    • Renewables
    • Offshore wind
    • Solar energy
    • Low carbon solutions
    • Hydrogen
    • H2H Saltend
    • Equinor Ventures
  • Where we are
    • Where we are
    • Algeria
    • Angola
    • Argentina
    • Australia
    • Azerbaijan
    • Bahamas
    • Belgium
    • Brazil
    • Canada
    • China
    • Denmark
    • EU — European Union
    • Germany
    • India
    • Ireland
    • Japan
    • Libya
    • Mexico
    • The Netherlands
    • Nicaragua
    • Nigeria
    • Norway
    • Poland
    • Russia
    • Singapore
    • South Africa
    • South Korea
    • Suriname
    • Tanzania
    • United Arab Emirates
    • United Kingdom
    • United States
    • Venezuela
  • How & why
    • How & why
    • Sustainability
    • Climate
    • ESG Reporting centre
    • Health, safety and security
    • Energy Perspectives
    • Impact assessments
    • Human rights
    • Digitalisation
  • Careers
    • Careers
    • Experienced professionals
    • Students
    • Graduates
    • Apprentices
    • Summer interns
    • What we offer
    • Culture & values
    • Recruitment scams
  • Stories
    • Stories
    • Dogger Bank offshore wind
    • safeguarding our wellbeing
    • Responding to criticism of hydraulic fracturing in the US
    • Hydrogen and Carbon capture
    • Weldar welding robot
    • Breakthrough for digitalisation
    • Hywind Tampen offshore wind farm
    • Greening our shipping
    • Why wind is the future
    • Echo — Equinor’s digital twin
    • IT experts in the Pyrenees
    • Statfjord A 40 years
    • Thorolf Rafto Challenge
    • Why is Johan Sverdrup important?
    • Can artificial intelligence save lives?
    • Is gas good for the environment?
    • Most digital workplace
    • Ocean of opportunities
    • Coding the energy future
    • Carbon capture solutions
    • Digitalisation changing lives
    • Techstars accelerator
    • Cutting CO2 emissions
    • Britain’s declining emissions
    • Lifting a platform
    • Cardiac arrest offshore
    • Battery hybrid supply ship
    • Pioneering Aasta Hansteen
    • Halvor in charge of Hywind
    • Offshore wind radar
    • Drilling with apps
    • Exciting inventions
    • How we cut costs
    • How Hywind was born
    • Building Hywind
    • Broad energy major
    • Living in a fridge
    • Gina Krog points the way
    • CEO Eldar Sætre speaks about the name change
    • Hooking up Mariner
    • Equinor’s new energy apprentices
    • Sætre at CERA week
    • Electrification of platforms
    • Competence transfer
    • Fieldmade 3D printed spare parts
  • About us
    • About us
    • Corporate governance
    • Organisation
    • Corporate Executive Committee
    • Governing bodies
    • Board of Directors
    • Annual General Meeting
    • Ethics and compliance in Equinor
    • Site info
    • Contacting Equinor
    • Heroes of Tomorrow
    • About our name change
    • Dialog: klima og energi
    • Glossary
  • News & media
  • Investors
    • Investors
    • Equity story
    • The Equinor share
    • Our shareholders
    • Annual Reports
    • Our quarterly results
    • Consensus
    • Contacts for investors
  • Suppliers
  • All Sites

The Troll field and the Troll A, B & C platforms

The Troll field comprises the main Troll Øst and Troll Vest structures in blocks 31/2, 31/3, 31/5 and 31/6. Containing about 40 per cent of total gas reserves on the Norwegian continental shelf (NCS), it represents the very cornerstone of Norway’s offshore gas production.

platform illustration

The Troll field lies in the northern part of the North Sea, around 65 kilometres west of Kollsnes, near Bergen. 

October 2020: Recently we installed a new process module on the Troll A platform. The module, built at @AkerSolutions Egersund, will receive gas from the new wells in Troll Phase 3. This is a historically profitable and robust project with low CO2-emissions, as Troll A is electrified. The project increase recoverable volumes from the Troll field with 347 billion standard cubic metres gas. The Troll Phase 3 project is expected to come on stream Q4 2021. 

Troll is also one of the largest oil fields on the Norwegian continental shelf, and at peak production in 2002, oil production was more than 400,000 barrels per day.


We operate the Troll A, B and C platforms and the landfall pipelines, while Gassco is operator for the gas processing plant at Kollsnes on behalf of Gassled. Equinor is technical service provider for Kollsnes operations.The enormous gas reservoirs 1,400 metres below sea level are expected to produce for at least another 70 years.

Proven in 1979

Norske Shell was chosen as operator when block 31/2 was awarded in April 1979. A large gas find with an underlying oil zone was proven later that year. The block was declared commercial in 1983.

The neighbouring blocks were awarded to then Statoil, now Equinor, Norsk Hydro and Saga Petroleum in 1983.

Block 31/2 contains 32 per cent of the Troll field’s reserves, while the remaining 68% lies in the three other blocks.

The licence terms for block 31/2 specified that Equinor could take over as operator for this acreage eight to 10 years after a discovery had been declared commercial.

In 1985, the two licences were unitised so that Troll could be developed as a single field.

Equinor took over as production operator for Troll Gas on 19 June 1996, while Hydro started production from Troll Oil in the fall of 1995.

Troll Gas

Troll Gas comprises the Troll A platform, the Kollsnes gas processing plant west of Bergen and the pipelines between the platform and the land plant.

Norske Shell was responsible for the first gas development phase on Troll, which received a green light from the Norwegian parliament (Storting) in December 1986. Four years later, we agreed with Shell to move the processing facilities originally due to be installed on the A platform to a plant on land at Kollsnes west of Bergen. This made it possible to build a simpler offshore gas production installation than originally planned, with smaller staffing.

Troll A is the tallest structure ever moved by humans over the surface of the Earth. Its concrete support section has been built for a producing life of 70 years. The platform is the only one of its kind on the NCS that is powered electrically from land.

We took over as operator for Troll Gas from Norske Shell on 19 June 1996 with gas coming on stream in the first half of that year, marking the completion of the gas development. Contractual gas deliveries began flowing from the field to continental Europe under the Troll gas sales agreements on 1 October 1996. Initial deliveries under these contracts, which began on 1 October 1993, were provided from our  Sleipner Øst development in the North Sea.

Declining pressure in the Troll reservoir means that more compression is needed to help drive gas production through the pipelines to the processing plant at Kollsnes. Two compressors have accordingly been installed on the A platform, and new technology allows these units to be powered from land. That in turn means zero carbon dioxide and nitrogen oxide emissions from the installation or the processing plant.

Troll Oil

Troll B, a floating process and accommodation platform with concrete hull, and Troll C, a floating process and accommodation platform with a steel hull, produce from thin oil-bearing layers in the Troll Vest reservoir.

The thin oil layer is between 22 and 26 meters in the Troll Vest oil province and 11 and 13 meters in the Troll Vest gas province. In order to recover oil from the thin layer, it has been necessary to develop advanced  drilling and production technology.

All of the more than 110 production wells to be drilled in Troll Oil are horizontal wells. This entails drilling in two phases. First, down to the reservoir, which lies at 1,600 meters beneath the sea bottom, and then to 3,200 meters in a horizontal direction through the reservoir.

A total of 28 of the wells are called multi-lateral wells, which have two or three horizontal sections that radiate out from a conjunctive point in the reservoir.

Want the full picture? We’d love to share this content with you, but you must accept cookies before we can. Click the Cookie settings link to enable marketing cookies

In April 2020, the world’s largest pipelaying vessel, the Solitaire, completed laying 26 kilometres of new pipeline between the Troll A platform and the new subsea installations of the Troll Phase 3 project. It’s our most profitable project ever, with a break-even of just USD 10 per barrel.

Location: Blocks 31/2, 31/3, 31/5 and 31/6 in the North Sea
Production start: Troll Oil, 19 September 1995
Production: Oil and gas

Read more about the Troll field on Norwegian petroleum's website.

Picture of the Troll B deck
  • Facebook
  • Twitter
  • Instagram
  • YouTube
  • LinkedIn
  • Terms and conditions
  • Privacy policy
  • Site info
  • Contact us
  • RSS
  • Cookie policy
Copyright © 2021 Equinor ASA