Skip to content
en|

Production shutdown on Troll C

August 20, 2014, 15:35 CEST
Bilde

The Troll C platform in the North Sea. (Photo: Øyvind Hagen)

The corroded pipe will be replaced. This is expected to require a seven-day shutdown.

Troll C has a daily equity production of some 58,000 barrels of oil, and exports 8 million cubic metres of gas. In addition some 34,000 barrels of oil and 2 million cubic metres of gas are transported from the Fram field through the Troll C platform.

Statoil’s interests:
Troll: 30.58%
Fram: 45%