The crude oil assay for Njord has been updated 31 August 2022 12:14 (CEST)Our crude oil assays page on Equinor.com has been updated.Please see link for the latest version.Latest news22 October 2026Aibel awarded contract for WistingThe Wisting partnership is awarding Aibel a front-end engineering and design study contract for the topsides of the production vessel.21 October 2026Equinor’s third quarter 2026 safety resultsEquinor's long-term safety trend is stable at the end of the third quarter of 2026. There have been no incidents with major accident potential or serious well control incidents in the quarter.15 October 2026Completing electrification project at TrollThe partial electrification of Troll B and Troll C has reduced emissions by around 330,000 tonnes of CO₂ per year. The Troll field continues to deliver high and stable production of oil and gas to Europe with low emissions.