All Sites Norwegian search
search language button
Equinor logo
  • What we do
    • What we do
    • Autumn conference 2020
    • Exploration
    • Fields and platforms
    • Terminals and refineries
    • Crude oil assays
    • Natural gas
    • REMIT
    • Shipping
    • Renewables
    • Offshore wind
    • Solar energy
    • Low carbon solutions
    • Hydrogen
    • H2H Saltend
    • Equinor Ventures
  • Where we are
    • Where we are
    • Algeria
    • Angola
    • Argentina
    • Australia
    • Azerbaijan
    • Bahamas
    • Belgium
    • Brazil
    • Canada
    • China
    • Denmark
    • EU — European Union
    • Germany
    • India
    • Ireland
    • Japan
    • Libya
    • Mexico
    • The Netherlands
    • Nicaragua
    • Nigeria
    • Norway
    • Poland
    • Russia
    • Singapore
    • South Africa
    • South Korea
    • Suriname
    • Tanzania
    • United Arab Emirates
    • United Kingdom
    • United States
    • Venezuela
  • How & why
    • How & why
    • Sustainability
    • Climate
    • ESG Reporting centre
    • Health, safety and security
    • Energy Perspectives
    • Impact assessments
    • Human rights
    • Digitalisation
  • Careers
    • Careers
    • Experienced professionals
    • Students
    • Graduates
    • Apprentices
    • Summer interns
    • What we offer
    • Culture & values
    • Recruitment scams
  • Stories
    • Stories
    • Dogger Bank offshore wind
    • safeguarding our wellbeing
    • Responding to criticism of hydraulic fracturing in the US
    • Hydrogen and Carbon capture
    • Weldar welding robot
    • Breakthrough for digitalisation
    • Hywind Tampen offshore wind farm
    • Greening our shipping
    • Why wind is the future
    • Echo — Equinor’s digital twin
    • IT experts in the Pyrenees
    • Statfjord A 40 years
    • Thorolf Rafto Challenge
    • Why is Johan Sverdrup important?
    • Can artificial intelligence save lives?
    • Is gas good for the environment?
    • Most digital workplace
    • Ocean of opportunities
    • Coding the energy future
    • Carbon capture solutions
    • Digitalisation changing lives
    • Techstars accelerator
    • Cutting CO2 emissions
    • Britain’s declining emissions
    • Lifting a platform
    • Cardiac arrest offshore
    • Battery hybrid supply ship
    • Pioneering Aasta Hansteen
    • Halvor in charge of Hywind
    • Offshore wind radar
    • Drilling with apps
    • Exciting inventions
    • How we cut costs
    • How Hywind was born
    • Building Hywind
    • Broad energy major
    • Living in a fridge
    • Gina Krog points the way
    • CEO Eldar Sætre speaks about the name change
    • Hooking up Mariner
    • Equinor’s new energy apprentices
    • Sætre at CERA week
    • Electrification of platforms
    • Competence transfer
    • Fieldmade 3D printed spare parts
  • About us
    • About us
    • Corporate governance
    • Organisation
    • Corporate Executive Committee
    • Governing bodies
    • Board of Directors
    • Annual General Meeting
    • Ethics and compliance in Equinor
    • Site info
    • Contacting Equinor
    • Heroes of Tomorrow
    • About our name change
    • Dialog: klima og energi
    • Glossary
  • News & media
  • Investors
    • Investors
    • Equity story
    • The Equinor share
    • Our shareholders
    • Annual Reports
    • Our quarterly results
    • Consensus
    • Contacts for investors
  • Suppliers
  • All Sites

Dudgeon and Sheringham Extension Projects

The Crown Estate has opened up for applications to extend operating offshore wind assets in England and Wales. 

The Dudgeon Extension Project (DEP) is a project with total installed capacity up to 402 MW and is located north and southeast of the operating Dudgeon Offshore Wind Farm.

The Sheringham extension Project (SEP) is a project with total installed capacity up to 317 MW and Is located north of the operating Sheringham Shoal Offshore Wind Farm.

Both extension projects have secured a grid connection to the existing grid at Norwich Main substation in Norfolk.
 

Scoping report – onshore cable corridor update PDF 207 KB
Dudgeon and Sheringham Extension Projects - Scoping report PDF 15 MB
  • Facebook
  • Twitter
  • Instagram
  • YouTube
  • LinkedIn
  • Terms and conditions
  • Privacy policy
  • Site info
  • Contact us
  • RSS
  • Cookie policy
Copyright © 2021 Equinor ASA