Alle nettsteder English search
search language button
Equinor logo
  • Hva vi gjør
    • Hva vi gjør
    • Autumn conference 2020
    • Leting
    • Felt og plattformer
    • Terminaler og raffinerier
    • Crude oil assays
    • Naturgass
    • REMIT
    • Shipping
    • Fornybar energi
    • Havvind
    • Solenergi
    • Lavkarbonløsninger
    • Hydrogen i Equinor
    • H2H Saltend
    • Equinor Ventures
  • Hvor vi er
    • Hvor vi er
    • Algeria
    • Angola
    • Argentina
    • Australia
    • Azerbaijan
    • Bahamas
    • Belgium
    • Brazil
    • Canada
    • China
    • Denmark
    • EU — European Union
    • Germany
    • India
    • Ireland
    • Japan
    • Libya
    • Mexico
    • The Netherlands
    • Nicaragua
    • Nigeria
    • Norge
    • Poland
    • Russia
    • Singapore
    • South Africa
    • South Korea
    • Suriname
    • Tanzania
    • United Arab Emirates
    • United Kingdom
    • United States
    • Venezuela
  • Hvordan og hvorfor
    • Hvordan og hvorfor
    • Bærekraft
    • Klima
    • Energy Perspectives
    • Reporting centre
    • Helse, sikkerhet og sikring
    • Konsekvensutredninger
    • Menneskerettigheter
    • Digitalisering
  • Karriere
    • Karriere
    • Experienced professionals
    • Students
    • Graduates
    • Lærlinger
    • Summer interns
    • What we offer
    • Culture & values
    • Rekrutteringssvindel
  • Historier
    • Historier
    • Svarer på kritikk av hydraulisk frakturering i USA
    • Hywind Tampen: med litt hjelp fra våre venner
    • Grønn skipsfart i Equinor
    • Derfor er vindkraft fremtiden
    • Echo — Equinors digitale tvilling
    • IT experts in the Pyrenees
    • Statfjord A fyller 40 år
    • Rafto-forelesningen
    • Hvorfor er Johan Sverdrup så viktig?
    • Kan kunstig intelligens redde ekte liv?
    • Kan gass være bra for miljøet?
    • Digital arbeidsplass
    • Sætres tale ved CERA
    • Utviklerne som koder morgendagens energiløsninger
    • Et hav av muligheter i Equinor
    • Equinors talentleir for jenter
    • Karbonfangst og -lagring
    • Digitalisering forandrer livene våre
    • Techstars accelerator
    • How ‘Carbon-Knut’ helped us reach our emissions target 2.5 years early
    • Britain’s declining emissions
    • Lifting a platform
    • Hjertestans offshore
    • Batterihybrid supplyskip
    • Pionerene Aasta Hansteen
    • Halvor er sjef for Hywind
    • Vindturbiner og radar
    • Å bore med apper
    • Spennende oppfinnelser
    • Slik forandret krisen oss
    • How Hywind was born
    • Hywind: det beste fra to verdener
    • Bredt energiselskap
    • Snøhvit 10 år
    • Unge sinn tar fremtidas utfordringer på alvor
    • Gina Krog baner vei
    • Energy efficiency
    • CEO Eldar Sætre om navneendringen
    • Mariner-feltet koples opp
    • Equinors fornybar energi-lærlinger
    • Elektrifisering av plattformer
    • Kompetanseoverføring
    • Hydrogen and Carbon capture
    • Sveiseroboten Weldar
    • Gjennombrudd i digitalisering
    • Kvinnelige ledere i Equinor
    • Reflections from our CEO
    • Dogger Bank offshore wind
    • Arbeid under covid-19
    • Fieldmade: 3D-printing av reservedeler
  • Om oss
    • Om oss
    • Eierstyring og selskapsledelse
    • Organisasjon
    • Konsernledelsen
    • Styrende organer
    • Styret
    • Generalforsamling
    • Etikk og etterlevelse i Equinor
    • Om dette nettstedet
    • Slik kontakter du Equinor
    • Morgendagens Helter
    • Skapte historie sammen
    • Om navnendringen vår
    • Dialog: klima og energi
    • Glossary
  • Leverandører
    • Leverandører
    • Leverandørdager 2019
  • News & media
  • Investors
    • Investors
    • Equity story
    • The Equinor share
    • Our shareholders
    • Annual Reports
    • Our quarterly results
    • Consensus
    • Contacts for investors
  • Alle nettsteder

Turnarounds

This page is available in English only

Production impact of turnarounds
Due to maintenance, our installations will be partly or fully closed down for shorter periods of time. This will affect the production of oil and natural gas. 

On this page, we give an estimate of reduced production due to maintenance for the coming quarter. We will also give an estimate of the total annual effect of reduced production due to maintenance.

Turnaround 2021
For 2021 the turnaround volumes are for liquids and gas.

2021  
First quarter 2021 Approximately xxxx boepd (in quarterly effect)
Annual effect 2021 Approximately xxxx boepd

Turnaround 2020
For 2020 the turnaround volumes are for liquids and gas.

2020  
Second quarter 2020 Approximately 10.000 boepd (in quarterly effect)
First quarter 2020 Approximately 20.000 boepd (in quarterly effect)
Annual effect 2020 Approximately 30.000 boepd

Turnaround 2019
For 2019 the turnaround volumes are for liquids and gas.

2019  
Fourth quarter 2019 Approximately 30.000 boepd (in quarterly effect)
Third  quarter 2019 Approximately 50.000 boepd (in quarterly effect)
Second quarter 2019 Approximately 60.000 boepd (in quarterly effect)
First quarter 2019 Approximately 15.000 boepd (in quarterly effect)
Annual effect 2019 Approximately 40.000 boepd

Turnaround 2018
For 2018 the turnaround volumes are for liquids and gas.

2018  
Fourth quarter 2018 Approximately 10.000 boepd (in quarterly effect)
Third quarter 2018 Approximately 80.000 boepd (in quarterly effect)
Second quarter 2018 Approximately 50.000 boepd (in quarterly effect)
First quarter 2018 Approximately 10.000 boepd (in quarterly effect)
Annual effect 2018 Approximately 35.000 boepd

Turnaround 2017
For 2017 the turnaround volumes are for liquids and gas.

2017  
Fourth quarter 2017 Approximately 25.000 boepd (in quarterly effect)
Third quarter 2017 Approximately 50.000 boepd (in quarterly effect)
Second quarter 2017 Approximately 75.000 boepd (in quarterly effect)
First quarter 2017 Approximately 10.000 boepd (in quarterly effect)
Annual effect 2017 Approximately 30.000 boepd

Turnaround 2016
For 2016 the turnaround volumes are for liquids and gas.

2016  
Fourth quarter 2016 Approximately 40.000 boepd (in quarterly effect)
Third quarter 2016 Approximately 55.000 boepd (in  quarterly effect)
Second quarter 2016 Approximately 25.000 boepd (in quarterly effect)
First quarter 2016 Approximately 25.000 boepd (in quarterly effect)
Annual effect 2016 Approximately 60.000 boepd

Turnaround 2015
For 2015 the turnaround volumes are for liquids and gas.

2015  
Fourth quarter 2015     Approximately 15.000 boepd
Third quarter 2015 Approximately 45.000 boepd (in quarterly effect)
Second quarter 2015 Approximately 95.000 boepd (in quarterly effect)
First quarter 2015 Approximately 10.000 boepd (in quarterly effect)
Annual effect 2015 Approximately 40.000 boepd

Turnaround 2014
For 2014 the turnaround volumes are for liquids and gas.

2014  
Third quarter 2014 Approximately 60.000 boepd (in quarterly effect)
Second quarter 2014 Approximately 110.000 boepd (in quarterly effect)
First quarter 2014 Approximately 10.000 boepd (in quarterly effect)
Annual effect 2014 Approximately 50.000 boepd
  • Facebook
  • Twitter
  • Instagram
  • YouTube
  • LinkedIn
  • Juridiske betingelser
  • Personvernerklæring
  • Om nettstedet
  • Kontakt oss
  • RSS
  • Retningslinjer for cookies
Copyright © 2021 Equinor ASA